Detail Panel, LBS, Panel, Insulator, Cross Arm, UNP
Menjual
Kwh meter, Box Panel, LBS, Panel, Insulator, Cross Arm, UNP, steel wire, NYY, TIC kabel, Traves, U-bolt, Traves, strain clamp, connector paralel Clamp Al-CU, CU-CU, Konektor Bimetal Al-Cu
dan Brocco lain-lain
Cros Arm Chanel UNP 8 P. 1, 8 Mtr
Cros Arm Chanel UNP 8 P. 2, 0 Mtr
Cros Arm Chanel UNP 8 P. 2, 5 Mtr
Cros Arm Chanel UNP 8 P. 3, 0 Mtr
Cros Arm Chanel UNP 10 P. 1, 8 Mtr
Cros Arm Chanel UNP 10 P. 2, 0 Mtr
Cros Arm Chanel UNP 10 P. 2, 5 Mtr
Cros Arm Chanel UNP 10 P. 3, 0 Mtr
CROS ARM DALAM SATUAN SET / TIANG BESI
Cros Arm Chanel A1 UNP 8 P. 1, 8 Mtr
a. Kanal UNP 8 = 1 buah
b. Klem Begel = 1 buah
c. Mur baud 16x60 = 2 buah
Cros Arm Chanel A2 UNP 8 P. 2, 0 Mtr ( Double)
a. Kanal UNP 8 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Bolt Nut & Washer 30 cm ( double drat) = 4 buah
Cros Arm Chanel A3 UNP 8 P. 2, 0 Mtr for afspan ( Double)
a. Kanal UNP 8 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 2 buah
Cros Arm Chanel A5 UNP 8 P. 2, 5 Mtr for afspan portal ( Double)
a. Kanal UNP 8 Panjang 2, 5 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 2 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 4 buah
Cros Arm Chanel A1 UNP 10 P. 1, 8 Mtr
a. Kanal UNP 10 Panjang 1, 8 Mtr = 1 buah
b. Klem Begel = 1 buah
c. Mur baud 16x60 = 2 buah
Cros Arm Chanel A2 UNP 10 P. 2, 0 Mtr ( Double)
a. Kanal UNP 10 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Bolt Nut & Washer 30 cm ( double drat) = 4 buah
Cros Arm Chanel A3 UNP 10 P. 2, 0 Mtr for afspan ( Double)
a. Kanal UNP 10 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 2 buah
Cros Arm Chanel A5 UNP 10 P. 2, 5 Mtr for afspan portal ( Double)
a. Kanal UNP 10 Panjang 2, 5 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 2 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 4 buah
CROS ARM DALAM SATUAN SET / TIANG BETON
Cros Arm Chanel A1 UNP 10 P. 1, 8 Mtr for Pin isolator
a. Kanal UNP 10 P, 1, 8 Mtr = 1 buah
b. Plat baja penaha traves/ simpul = 1 buah
c. Klem begel = 1 buah
d. Bolt Nut & Washer 6 cm = 2 bh
e. Bolt Nut & Washer 26 cm = 1 buah
Crom Arm Chanel A2 UNP 10 ( double)
a. Kanal UNP 10 P. 2, 0 Mtr = 2 btg
b. Plat baja penaha traves/ simpul = 2 buah
c. Bolt Nut & Washer 30 cm ( double drat) = 4 buah
d. Bolt Nut & waher 26 cm = 1 buah
Cros Arm Chanel A3 UNP 8 P. 2, 0 Mtr for afspan ( Double)
a. Kanal UNP 10 P. 2, 0 Mtr = 2 btg
b. Plat baja penahan traves/ simpul = 2 buah
c. Bolt Nut & Washer 30 cm ( double drat) = 2 buah
d. Bolt Nut & Washer 26 cm = 1 buah
e. Bolt Nut & Washer 140 cm = 6 buah
f. Plat strip type 1 = 4 buah
g. Plat strip type 2 = 2 buah
Cros Arm Chanel A5 UNP 8 P. 2, 5 Mtr for afspan Tiang portal
a. Kanal UNP 10 P. 2, 5 Mtr = 2 btg
b. Plat baja penahan traves/ simpul = 4 buah
c. Bolt Nut dan Washer 26 cm = 2 buah
d. Bolt Nut & Washer 30 cm = 4 buah
e. Bolt Nut & Washer 14 cm = 8 buah
f. Plat strip type 1 = 4 buah
g. Plat strip type 2 = 4 buah
Klem begel/ Pole Clamp 3"
Klem begel/ Pole Clamp 4"
Klem begel/ Pole Clamp 5"
Klem begel/ Pole Clamp 6"
Pole clamp for stay/ pole band 3"
Pole clamp for stay/ pole band 4"
Pole clamp for stay/ pole band 5"
Pole clamp for stay/ pole band 6"
Arm Tie/ Brace for support cros arm
Arm Tie/ Brace for support cros arm/ Penyangga traves
a. Arm tie = 2 buah
b. Bolt Nut & Washer 6 cm = 4 buah
c. Pole band/ Pole clamp = 1 set
Bolt Nut & washer 16x60 mm
Bolt Nut & washer 16 x 140 mm
Bolt Nut & washer 16 x 260 mm
Bolt Nut & washer 16 x 300 mm
Bolt U strap / Penjepit tiang pada aspan
Plate strip for afspan
Plat Simpul / Plat baja penahan cros arm ( pole beton)
Clamp begel 11/ 200 daN ( pole beton)
Clam begel 9/ 200 daN ( pole beton)
Clam begel 7/ 100 daN ( pole beton)
Pole Band/ Klem stay 11/ 200 daN ( pole beton)
Pole band/ Clamp stay 9/ 200 daN ( pole beton)
Pole band / Clamp stay 7/ 100 daN ( pole beton)
ACCESORIES CONDUCTOR HUTM
Binding Wire
Top ties / Filaca
Compresion Joint For AAAC 35
Compresion Joint For AAAC 70
Compresion Joint For AAAC 150
Compresion Joint For AAAC 240
H. Type Connector 35/ 35
H. Type Connector 35/ 70
H. Type Connector 70/ 70
H. Type Connector 70/ 150
H. Type Connector 150/ 150
TRECKSCHOOR ( ASSEMBLY)
DRUCKSCHOOR ( ASSEMBLY)
Tiang 11 mtr daN 156
Tiang 9 mtr daN 156
Tiang 11 mtr daN 156
Tiang 9 mtr daN 156
081320918099 erys
NO NAMA MATERIAL
A POLE HARDWARE/ HUTM KONTRUKSI TIANG BESI
1 Cros Arm Chanel UNP 8 P. 1, 8 Mtr
2 Cros Arm Chanel UNP 8 P. 2, 0 Mtr
3 Cros Arm Chanel UNP 8 P. 2, 5 Mtr
4 Cros Arm Chanel UNP 8 P. 3, 0 Mtr
5 Cros Arm Chanel UNP 10 P. 1, 8 Mtr
6 Cros Arm Chanel UNP 10 P. 2, 0 Mtr
7 Cros Arm Chanel UNP 10 P. 2, 5 Mtr
8 Cros Arm Chanel UNP 10 P. 3, 0 Mtr
CROS ARM DALAM SATUAN SET / TIANG BESI
9 Cros Arm Chanel A1 UNP 8 P. 1, 8 Mtr
a. Kanal UNP 8 = 1 buah
b. Klem Begel = 1 buah
c. Mur baud 16x60 = 2 buah
10 Cros Arm Chanel A2 UNP 8 P. 2, 0 Mtr ( Double)
a. Kanal UNP 8 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Bolt Nut & Washer 30 cm ( double drat) = 4 buah
11 Cros Arm Chanel A3 UNP 8 P. 2, 0 Mtr for afspan ( Double)
a. Kanal UNP 8 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 2 buah
12 Cros Arm Chanel A5 UNP 8 P. 2, 5 Mtr for afspan portal ( Double)
a. Kanal UNP 8 Panjang 2, 5 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 2 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 4 buah
13 Cros Arm Chanel A1 UNP 10 P. 1, 8 Mtr
a. Kanal UNP 10 Panjang 1, 8 Mtr = 1 buah
b. Klem Begel = 1 buah
c. Mur baud 16x60 = 2 buah
14 Cros Arm Chanel A2 UNP 10 P. 2, 0 Mtr ( Double)
a. Kanal UNP 10 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Bolt Nut & Washer 30 cm ( double drat) = 4 buah
15 Cros Arm Chanel A3 UNP 10 P. 2, 0 Mtr for afspan ( Double)
a. Kanal UNP 10 Panjang 2 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 1 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 2 buah
16 Cros Arm Chanel A5 UNP 10 P. 2, 5 Mtr for afspan portal ( Double)
a. Kanal UNP 10 Panjang 2, 5 Mtr = 2 buah
b. U strap/ U bolt untuk jepit traves = 2 set
c. Plat strip type 1 = 4 buah
d. Bolt Nut & waher 14 cm = 4 buah
e. Bolt Nut & washer 30 cm = 4 buah
CROS ARM DALAM SATUAN SET / TIANG BETON
17 Cros Arm Chanel A1 UNP 10 P. 1, 8 Mtr for Pin isolator
a. Kanal UNP 10 P, 1, 8 Mtr = 1 buah
b. Plat baja penaha traves/ simpul = 1 buah
c. Klem begel = 1 buah
d. Bolt Nut & Washer 6 cm = 2 bh
e. Bolt Nut & Washer 26 cm = 1 buah
18 Crom Arm Chanel A2 UNP 10 ( double)
a. Kanal UNP 10 P. 2, 0 Mtr = 2 btg
b. Plat baja penaha traves/ simpul = 2 buah
c. Bolt Nut & Washer 30 cm ( double drat) = 4 buah
d. Bolt Nut & waher 26 cm = 1 buah
19 Cros Arm Chanel A3 UNP 8 P. 2, 0 Mtr for afspan ( Double)
a. Kanal UNP 10 P. 2, 0 Mtr = 2 btg
b. Plat baja penahan traves/ simpul = 2 buah
c. Bolt Nut & Washer 30 cm ( double drat) = 2 buah
d. Bolt Nut & Washer 26 cm = 1 buah
e. Bolt Nut & Washer 140 cm = 6 buah
f. Plat strip type 1 = 4 buah
g. Plat strip type 2 = 2 buah
20 Cros Arm Chanel A5 UNP 8 P. 2, 5 Mtr for afspan Tiang portal
a. Kanal UNP 10 P. 2, 5 Mtr = 2 btg
b. Plat baja penahan traves/ simpul = 4 buah
c. Bolt Nut dan Washer 26 cm = 2 buah
d. Bolt Nut & Washer 30 cm = 4 buah
e. Bolt Nut & Washer 14 cm = 8 buah
f. Plat strip type 1 = 4 buah
g. Plat strip type 2 = 4 buah
17 Klem begel/ Pole Clamp 3"
18 Klem begel/ Pole Clamp 4"
19 Klem begel/ Pole Clamp 5"
20 Klem begel/ Pole Clamp 6"
21 Pole clamp for stay/ pole band 3"
22 Pole clamp for stay/ pole band 4"
23 Pole clamp for stay/ pole band 5"
24 Pole clamp for stay/ pole band 6"
25 Arm Tie/ Brace for support cros arm
26 Arm Tie/ Brace for support cros arm/ Penyangga traves
a. Arm tie = 2 buah
b. Bolt Nut & Washer 6 cm = 4 buah
c. Pole band/ Pole clamp = 1 set
26 Bolt Nut & washer 16x60 mm
27 Bolt Nut & washer 16 x 140 mm
28 Bolt Nut & washer 16 x 260 mm
29 Bolt Nut & washer 16 x 300 mm
30 Bolt U strap / Penjepit tiang pada aspan
31 Plate strip for afspan
32 Plat Simpul / Plat baja penahan cros arm ( pole beton)
33 Clamp begel 11/ 200 daN ( pole beton)
34 Clam begel 9/ 200 daN ( pole beton)
35 Clam begel 7/ 100 daN ( pole beton)
36 Pole Band/ Klem stay 11/ 200 daN ( pole beton)
37 Pole band/ Clamp stay 9/ 200 daN ( pole beton)
38 Pole band / Clamp stay 7/ 100 daN ( pole beton)
B ACCESORIES CONDUCTOR HUTM
1 Binding Wire
2 Top ties / Filaca
3 Compresion Joint For AAAC 35
4 Compresion Joint For AAAC 70
5 Compresion Joint For AAAC 150
6 Compresion Joint For AAAC 240
7 H. Type Connector 35/ 35
8 H. Type Connector 35/ 70
9 H. Type Connector 70/ 70
10 H. Type Connector 70/ 150
11 H. Type Connector 150/ 150
C. TRECKSCHOOR ( ASSEMBLY)
D DRUCKSCHOOR ( ASSEMBLY)
Tiang 11 mtr daN 156
Tiang 9 mtr daN 156
Tiang 11 mtr daN 156
Tiang 9 mtr daN 156
Tampilkan Lebih Banyak